Well, did an inventory of what still need to be completed with this boat and it seems I am almost done with this boat and project.
1 - I need to order some blocks to better engineer the bungee that holds the tension on the sheeting system.
2 - Check final weight of keel and hull to ensure all is in order, I may have to add weights to the B and C rigs to make the whole boat, rig come to minimum weight if it comes in less.
3 - Complete sail box. I ordered some clips from West Marine that will hold the rigs in place, and then need to figure out a way to secure rigs on place using rubber bands, bungee cord, hooks and eyes etc.
4 - Get the rigs measured in and the hull.
5 - I did order a hull cover and a keel cover from Chuck LeMahieu of Richardson, TX (his website is listed as a link on this blog)
6 - I also ordered a new DX6i radio with the new marine receiver MR3000
This was a great project, although it took much longer than I expected, but at the end of the day, I built this boat with my own two hands! I do not know if the boat will be competitive or not, but I feel it is the sailor who is good, not necessarily the boat.
Saturday, December 26, 2009
Sail Box

Worked on the sail box some more on Wednesday together with Al and Collin. We looked at some photos of Adrian's sail box and decided to put in a slot to hold the keel and rudder securely. I still need to find some clasps to hold the box closed securely and a carry handle.

Sail box view of the inside before 3rd panel installed
Panel for 'C' rig and the 'B' rig on the back panel. Also slots for keel and rudder
Here you can see the 'A' rig on the inside of the front panel and the 'C' rig located on the inside panel and the 'B' rig on the back panel as well as the keel and rudder.
Below - you can see this with the inside panel closed and only the 'A' rig accessible.
Tuesday, December 22, 2009
Sail Box and other Items
Last night I had a few hours to myself so I went to the boat loft and put a coat of sealant on the inside of the sail box. I am not sure when I will have the time to work on the box again as extremely busy with work.
I also bought some permatex silicon and used it to attach the bow bumper to the stem. I will see how this stuff holds up, this is the stuff that the guys in Vancouver use.
It was also discovered that the bungee I was using to keep tension on the sheeting system broke and figured this was due to how it was run, too much friction in one location. I will have to figure out a way to rig this bungee.
I also got some wire so I can hard wire the on/off switch and the new batteries arrived.
I also bought some permatex silicon and used it to attach the bow bumper to the stem. I will see how this stuff holds up, this is the stuff that the guys in Vancouver use.
It was also discovered that the bungee I was using to keep tension on the sheeting system broke and figured this was due to how it was run, too much friction in one location. I will have to figure out a way to rig this bungee.
I also got some wire so I can hard wire the on/off switch and the new batteries arrived.
Monday, December 7, 2009
Tuesday, December 1, 2009
Sail Box (Continued)




Sail box with piano hinge installed

Yesterday we cut the sail box on half lengthwise to make two halves. I then installed the piano hinge. Today I will put a coat of polyurethane on the inside of the box and then this afternoon we will do some work on the inside. This box will hold all three rigs so an extra panel will be installed on the inside with another piano hinge for holding the C rig. Stay tuned for more pictures on this project.